post #1
27 June 2005, 17:18 UTC#1
Well here is some pics of my bar.. I don’t have any pics of the basement before we started putting the chairs in but I can tell you now it was fucked up!
Most things in the bar we have got for free (even the pub chairs was taken from a police station without them knowing)
Chairs gone in, still got lots of shit to move yet
External image not preserved — inspect source: http://www.wkhvideos.com/bar/1.jpg
Again I don’t have a photo of the roof before we pulled it down.
External image not preserved — inspect source: http://www.wkhvideos.com/bar/2.jpg
Chair have been had to be lowed again so we have the perfect lean
External image not preserved — inspect source: http://www.wkhvideos.com/bar/3.jpg
A image of the other room in the basement (soon to be a bar area)
External image not preserved — inspect source: http://www.wkhvideos.com/bar/4.jpg
All the phone, light, power and tv cables are drilled into the roof
External image not preserved — inspect source: http://www.wkhvideos.com/bar/5.jpg
The roof goes up
External image not preserved — inspect source: http://www.wkhvideos.com/bar/6.jpg
Bar is ready for its first night (ignore the flags and shirts on the wall… they are there for now until we paint the walls) also the wall to your right is going to be knocked through to make the bar opening
External image not preserved — inspect source: http://www.wkhvideos.com/bar/7.jpg
You can see a coal shoot in the top right (soon to have a extractor fan installed)
External image not preserved — inspect source: http://www.wkhvideos.com/bar/8.jpg
The lads at 3 in the morning after being in town all night
External image not preserved — inspect source: http://www.wkhvideos.com/bar/9.jpg
Same again
External image not preserved — inspect source: http://www.wkhvideos.com/bar/10.jpg
We have yet to knock the wall down, add another two fridges, add the pumps and sort out all the walls (there is loads more to be done, but this is what ive done so far) (and its only cost about £49)
Most things in the bar we have got for free (even the pub chairs was taken from a police station without them knowing)
Chairs gone in, still got lots of shit to move yet
External image not preserved — inspect source: http://www.wkhvideos.com/bar/1.jpg
Again I don’t have a photo of the roof before we pulled it down.
External image not preserved — inspect source: http://www.wkhvideos.com/bar/2.jpg
Chair have been had to be lowed again so we have the perfect lean
External image not preserved — inspect source: http://www.wkhvideos.com/bar/3.jpg
A image of the other room in the basement (soon to be a bar area)
External image not preserved — inspect source: http://www.wkhvideos.com/bar/4.jpg
All the phone, light, power and tv cables are drilled into the roof
External image not preserved — inspect source: http://www.wkhvideos.com/bar/5.jpg
The roof goes up
External image not preserved — inspect source: http://www.wkhvideos.com/bar/6.jpg
Bar is ready for its first night (ignore the flags and shirts on the wall… they are there for now until we paint the walls) also the wall to your right is going to be knocked through to make the bar opening
External image not preserved — inspect source: http://www.wkhvideos.com/bar/7.jpg
You can see a coal shoot in the top right (soon to have a extractor fan installed)
External image not preserved — inspect source: http://www.wkhvideos.com/bar/8.jpg
The lads at 3 in the morning after being in town all night
External image not preserved — inspect source: http://www.wkhvideos.com/bar/9.jpg
Same again
External image not preserved — inspect source: http://www.wkhvideos.com/bar/10.jpg
We have yet to knock the wall down, add another two fridges, add the pumps and sort out all the walls (there is loads more to be done, but this is what ive done so far) (and its only cost about £49)
